DESCRIPTION | A two pack epoxy coal tar coating having excellent water and alkali resistance. This is suitable for protection of steel in conjunction with cathodic protection system. It withstands back-filling materials and is not affected by alkalinity or sulphates in soil water. |
RECOMMANDED USE | In coating structural steel ,pipelines of steel and concrete and equipments for :Refineries & petrochemical plants ,fertilizer plants. Chemical lplants,Hydel penstocks. Sewage Treatment plants. Barrage Gales. . |
TYPE | Two pack, cured with polyamide. |
MIXING RATIO | Base : Catalyst : 4 : 1 by volume. |
MATURATION TIME | 20 Minutes |
POT LIFE OF MIXTURE | 4-6 hrs. |
FINISH | Smooth Egg. shell to semi Glossy |
COLOUR | black. |
COVERING CAPACITY (THEORATICALLY) | 5-6 Sq.Mt/Ltr. |
RECOMMENDED DFT | 100 - 125 microns per coat |
VOLUME SOLIDS % | APPROX 50 % |
DRYING TIME | Touch – 4 hr. Hard – Overnight |
OVER COATING INTERVAL | Min. 24 hours /max .5days |
FLASH POINT | Above 22C |
RECOMMENDED THINNER | EPOXY Thinner |
METHOD OF APPLICATION | Brush or Spray |
DIRECTION FOR USE | Surface should be clean, free rust, grease, oil, moisture and lose flakes. Stir the contents before use. Mix base and hardener properly in the recommend ratio. Allow mixture to mature for 20 minutes before applying by brush or spray. Use necessary recommend thinner if required. |